Kitchener Wastewater Treatment Plant Upgrades

Status: construction

Municipal Class Environmental Assessment (Class EA) study for upgrading the Kitchener Wastewater Treatment Plant (WWTP) located in the City of Kitchener. The proposed improvements focus on upgrading the WWTP’s treatment process, as well as for the provision of standby power to provide security to ensure essential operations will continue in the event of a power failure. The proposed upgrades are part of the last of three WWTP upgrade phases and are intended to improve effluent quality and operational reliability without an increase to the existing WWTP’s rated capacity. The proposed works will ensure better effluent quality and odour management, provide reliable, long-term operation and performance, decommission existing biosolids storage lagoons and improve process efficiency (replace aging equipment).

Project files:

Contact Us

Region of Waterloo HQ
150 Frederick St.
Kitchener, Ontario N2G 4J3
Telephone: 519-575-4400
Fax: 519-575-4481

For general inquiries:
Regionalinquiries@regionofwaterloo.ca

Other Main Region Locations

Cambridge Main Office
150 Main St.
Cambridge, ON N1R 6P9

Waterloo Main Office
99 Regina St. S.
Waterloo, ON N2J 4V3