Regional Water System Upgrades in Cambridge and North Dumfries

This project was previously referred to as the West Cambridge water systems upgrades.

Status: design

The aim of the Class EA is to confirm the necessary infrastructure requirements and system upgrades needed to strengthen the overall capacity and resiliency of the supply, storage, and transmission within the Cam 3 and Lloyd Brown pressure zones, and to increase the efficiency and flexibility of system operations.

Project file:

Contact Us

Region of Waterloo HQ
150 Frederick St.
Kitchener, Ontario N2G 4J3
Telephone: 519-575-4400
Fax: 519-575-4481

For general inquiries:
Regionalinquiries@regionofwaterloo.ca

Other Main Region Locations

Cambridge Main Office
150 Main St.
Cambridge, ON N1R 6P9

Waterloo Main Office
99 Regina St. S.
Waterloo, ON N2J 4V3